Electromechanical assembly of the expansion for 132 kV input/output fields.
Wiring, panels, connections, and commissioning. Installation of 132 kV HV CAS underground cable with a length of 2.5 km.
❖ DISCO S.A.
Project 1: Electrical maintenance of premises. Provision and installation of FM and lighting
Project 2: Complete remodelling of the installation of cold rooms and equipment (Bulnes Branch)
❖ JUMBO S.A.
System: Electrical remodeling of the Jumbo Lomas de Zamora and Jumbo Neuquén premises.
ELECTRIFICATION AND AUTOMATION PROJECTS
❖ EDENOR (MIGUELETES SUBSTATION) TEL3.
Project: Electromechanical assembly of HV and substation.
Power: 80 MVA (80,000 KVA) at 132 kV.
Project Value: U$S 556,000.
Project Duration: 6 months.
❖ SUB ESTACION 132 KV CHARCAS – CAPITAL FEDERAL.
Client TECMAS - SIEMENS
Installation and assembly of 132 KV equipment, antennas for 132 kV equipment, machining and assembly of transformers, laying of 635 mm2 MT cables.
Laying and connecting power, protection and control cables.
Junín Plant, Buenos Aires.
Installation of FM feeders and control system in Cáscara Silo.
❖ Puerto Arroyo Seco – Santa Fé
Driving Force Installation Port Sector, Silos and Handling
❖ Planta Daireaux Bs. As.
FM installation and Command work in the Pelletizing Sector and Loading and Unloading Silos at the General Pico Plant – La Pampa FM installation and Command in the Cereal Storage Silo.
We invite you to check out more information about our work.